乐动官方端网站登录入口

COMPANY BUSINESSES

Suburban Railway from Southern 4th Ring Road to the South Railway Station of Zhengzhou

The suburban railway from the Southern 4th Ring Road to South Railway Station of Zhengzhou measures 31.7 kilometers in total, with the elevated line being 16.2 kilometers long or so and the number of overpass stations reaching 7. The whole line comprises 8 elevated sections, entrance and exit lines and 八-shaped lines. Prefabricated U-girder has been adopted as standard girder, with the length of the standard girder reaching 14.3 kilometers and the cast-in-place continuous beam measuring 1.9 kil...

First-Stage Beihu Rapid Rail Transit Line of Changchun

The Beihu Rapid Line of Changchun mainly connects the north of the central city and the city’s northeast. The first-stage projects is aimed at a total length of 13.22 kilometers with a total of 12 stations. The maximum distance between two stations is 2431.5 meters, while the minimum distance 607 meters, with the average station spacing being 1184.778 meters. The maximum longitudinal slope of the rapid line is 2.9%, while the minimum radius of the main line curve is 150 meters. The starting poi...

Hanoi Urban Rail Transit Jiling-Hedong Line

The urban rail transit line Jiling-Hedong of Hanoi measures 13021.48m long. It is an elevated line with 12 stations and the average station interval 1151m. A rail yard is established at southeast side of Wenxi Station, covering an area of 26.2 hectares. The project adopts the monolithic track bed and seamless line and the interval bridge uses 30m double box single room simple-supported box girder. The prefabricated girder is made at the girder yard and lifted with trolley under the bridge and ere...

Airport Rail Transit Line of Wuhan

The airport line of Wuhan(northward extension of Line 2)starts from Terminal 3 of the Tianhe Airport in the north and stretches southward to the Jinyintan Station, the starting point of the first-stage project of Line 2. The main line, which measures 19.8 kilometers long in total and comprising 7 stations, is an important passage connecting the Tianhe Airport and the urban areas. We have joined hands with Wuhan Municipal Engineering Design and Research Institute Co. Ltd. to win the bid for th...

Reconstruction of Longyang Avenue(Qintai Avenue~South Moshuihu Road)on 2nd Ring Road of Wuhan

Reconstruction of the Longyang Avenue has been a key project of Wuhan. The avenue is an important integral part of the 2nd Ring Road and is one of the important passages linking 2nd and 3rd ring roads. The project is located at Wangjiawan Business Area, where Longyang Avenue and Hanyang Avenue intersect. The road grade is identified as urban expressway and there are two-way 6 lanes on standard sections. The designed service life of the bridge structure:100 years, and the designed live load:ur...

Shenzhen Rail Transit Line 4 viaduct

Phase II of Shenzhen Rail Transit Line 4 is the northwards extension section of the Phase I project of Line 4, starting from the Children’s Palace (Children’s Center) under construction in Futian District and ending at Longhua Town, Bao’an District. The section measures about 16km in length, including 10.1km elevated line and the rest on the ground or tunnel. Phase II of Shenzhen Rail Transit Line 4 (Children’s Palace –Qinghu) is China’s first BOT project in real meaning and an import...

Elevated Sections and Stations of the “Blue Silicon Valley” Inter-City Rail Transit in Qingdao

Section 02 of the civil engineering of the Qingdao-Haiyang inter-city(the Blue Silicon Valley section)rail transit project comprises 4 stations and 4 sections. The length of the rail transit line measures 18.421 kilometers, with elevated sections totaling 13.7 kilometers long, the tunnel in Laoshan Mountain being 4.58 kilometers long, and the roadbed being 141.162 meters long. The line passes the scenic reserve of the Laoshan Mountain and the core area of the Blue Silicon Valley. The Beijiush...

Viaduct of Nanjing South Railway Station-Lukou Airport Section of Nanjing-Gaochun Rapid Rail

The Nanjing South Railway Station-Lukou Airport Section of Nanjing-Gaochun Rapid Rail starts from Lukou Airport in the south, extending via Lukou New Town, Dongshanqiao-Moling District and west of Dongshan Sub-City to Nanjing South Railway Station. It is totally about 35.8 kilometers long. The viaduct is about 16.9 kilometers long. The transitional section is about 0.7 kilometer long, and the underground section is about 18.2 kilometers long. The U-shaped girder has a standard span of 30 meters, ...

The Ningtian Inter-City Overpass of Nanjing Metro

The first-stage project of Ningtian inter-city rail transit starts from Daqiao North Road Station and, by way of Jiangbeipukou District and Liuhe District, it ends at Jinniu Lake Station in Liuhe District. The rail transit line runs alongside the Jiangbei Avenue from south to north through the development axis of the sub-city in the area north of the Yangtze River, and connects the scenic area of the Jinniu Lake in the north. Passing Daqiao North Road, Taifeng Road, Jiangbei Avenue, Longjin Road,...

TO BE A DESIGN-LEADING
INTEGRATED SERVICE PROVIDER FOR
URBAN CONSTRUCTION